• Aluminum Scaffolding Step Ladder in light weight CNBM System 1
  • Aluminum Scaffolding Step Ladder in light weight CNBM System 2
Aluminum Scaffolding Step Ladder in light weight CNBM

Aluminum Scaffolding Step Ladder in light weight CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FS-AL

  • Material: Aluminum

  • Feature: Telescopic Ladders

  • Type: Industrial Ladders

  • Structure: Step Ladders

  • Step: Antiskid

  • Container loading: 120units/20'FCL, 300Units/40'FCL

  • Material No.: 6061

  • Loading Capacity: 300kg

  • Certification: CE

Aluminum Scaffolding Step Ladder in light weight CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model No: RS-A

Product Name:  Aluminium Ringlock Scaffolding System

4.Features:

With Ringlock Scaffolding System, you are making an investment in a perfected and complete system with all the necessary approvals, and hence in rapid, safe, profitable and highly versatile scaffolding construction. The unique combination of positive and rigid connection in a fast and non-bolted system permits a choice of automatically right-angled, linear or angled connections with built-in safety.       

Up to 8 connections at various angles can be made in one plane with the statically ideal Allround connector. The assembly of the ringlock system is selfexplanatory. If required, you can insert tubular or U-ledgers to accommodate the system scaffolding decks: the stiffening effect of the latter means that longitudinal ledgers parallel to the deck are superfluous – a material and weight saving that brings additional assembly and transportation benefits

5.The specification componant parts of Steel Ringlock Scaffolding Ledger 

Ring   Lock System Scaffold Ledger / Horizontals

Model

Description

Weight(kg)

Weight(lbs)

AR.L.3050

Ring Lock Ledger 3050mm (10')

11.66

25.74

AR.L.2745

Ring Lock Ledger 2745mm (9')

10.57

26.74

AR.L.2440

Ring Lock Ledger 2440mm (8')

9.47

20.88

AR.L.2130

Ring Lock Ledger 2130mm (7')

8.36

18.43

AR.L.1830

Ring Lock Ledger 1830mm (6')

7.28

16.06

AR.L.1520

Ring Lock Ledger 1520mm (5')

6.17

13.61

AR.L.1220

Ring Lock Ledger 1220mm (4')

5.10

11.24

AR.L.1150

Ring Lock Ledger 1150mm (3'10")

4.84

10.68

AR.L.1065

Ring Lock Ledger 1065mm (3'6")

4.54

10.01

AR.L.910

Ring Lock Ledger 910mm (3')

3.98

8.78

AR.L.650

Ring Lock Ledger 650mm (2'2")

3.05

6.73

AR.L.610

Ring Lock Ledger 610mm (2')

2.91

6.41

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:Well my parents are going out of state soon and I want to get a Scaffold Ear Piercing but when i take the earring off does the piecing show?
you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
Q:In the settlement, there are also iron welded steel pipe welded pipe unit price information price, should I be in the settlement in which unit pricing is reasonable? What is the difference between these two materials? Can provide a better basis for authority. Thank you
Versatility: the main components are the use of ordinary fastener type steel pipe scaffolding, steel pipe can be used to connect fasteners, versatility.4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q:i know they are meant to be done as one piercing and with one bar to reduce the risk of them not aligning properly but is it possible to have it done as one piercing and then replacing the bar with two separate ones after it has partially healed. is there still a risk? also, how low down and at what angle should the bar be?thanks x
They can be done as two separate piercings, and it is up to the piercer and the shape of your ear to decide if something like that will be done. However, I would not recommend it, because even if it is partially healed, putting two separate earrings in can still misalign the piercing when you go to put the bar back in later. I would recommend keeping the bar in, it's a guaranteed way to make your piercing work out. Besides, once you get used to the bar, you won't even know you have it in! Much easier than keeping track of two separate earrings and making sure they still align months down the road. As for the angle, it depends on your preference and what is able to be done due to the shape of your ear. Some people want theirs straight across, others want a much steeper angle. It all depends on preference and shape of ear. Hope this helps, good luck!
Q:Another from the ministry of silly questions…I’d like to support a lightweight tarpaulin over my back yard. Single slope, high side attached to the house and low side attached to a scaffolding pole, running horizontally between two walls. Fair weather, no high winds or pooling. The run of pole would be 8 meters. The longest poles seem to be 6m, so I need to use a coupling. Will this be strong enough – ish? I imagine the most stressed point would be just around the edges of the coupling, so If I used two joints/couplings in the bar, wouldn’t I half the strain on a single one?Also if I made the joints at 1m and 7m would that be better than to have a joint in the middle where the most flexing will be?Also bit more expensive, but with Aluminium the bar will be 20kg lighter – buy will it be as strong joint wise?Will a tubular coupling be as good as a external one?If anyone knows.. Thanks!
The problem with your proposal is that you realise that the wind/rain could have an effect but chose to ignore the consequences if it occurs. 'Proper' scaffolding is designed and such an unsupported span would never occur in a 'normal' scaffold so the standard calculations would not work. There is also the possible effect on the walls, could they take an abnormal load? I would look at theatrical or music stage hire using trussed beams.
Q:I need to rent a scaffle that is motorized so I can reach up to 16 ft
your best thing to do is to look up in the phone book or Internet. there are lots of different companies that rent out lifts. Depending on where you live. I know of a few nationwide ones, Hertz for one. Just call the company and tell them you need a lift. if the work is to be done outside I would use a small boom lift, but if it needs to be done inside just a regular platform lift should do the job. they also come in gas, and electric but being that you only need one to reach 16 ft. you probably only need an electric, just be sure to charge it over night when you are not using it! You will probably have to make a credit card deposit also.
Q:i'm writting an essay about symbols in the scarlet letter. can you tell me what the scaffold symbolizes or any other symbols. thanks
Scaffold Scarlet Letter
Q:at what age can you get a scaffold/industrial piercing in england without parental consent?
there actually are no laws in the UK about piercings other than the genitals and female nipples (you have to be 16 to get pierced in any of those locations) it is up to individual studios on what age they don't require parental consent. the best thing to do would be to contact your local shop.
Q:What is the meaning of WDJ in the WDJ bowl buckle scaffold
Stable frame.Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents
Q:I'm 14 and getting my scaffold pierced soon. I am terrible with nerves and pain. I had a panic attack getting my doubles pierced. To calm my nerves, can you tell me what to expect?
I've passed out getting shots before! Almost to the point where I had a seizure. And I got mine done, and I thought I was going to pass out again! But my lady was really nice. It really doesn't feel like anything more than a lobe piercing, but you feel a bit of a pinch the second time it goes through. Nothing more! You'll be fine. Ask if you can hang around for a bit after to make sure you're okay! Good luck. Just take a deep breath in, then let it out as the needle goes through. Good luck!
Q:I'm asking this in favour of my friend who currently has no internet.She had her scaffold piercing done about 2 days ago and today it got knocked and started bleeding. It's been bleeding for about 3 hours now and she's worried about it.
First you gotta stop touching it, that's probably causing the irratation, hence bleeding. IT'll take time to heal, just leave it alone clean out the blood every hour or so, BE CAREFUL! and LEAVE IT IN!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords