Tower Crane TC7135 Double-trolley 16T 71M
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC7135 Description
Feature: Tower Crane
Condition: New
Application: Construction
Max.Lifting Load: 16T
Max Tip Load:3.5T
Independent Height:50M
Max Lifting Height: 200M
Span: 71m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TC7135
Packaging & Delivery of Tower Crane TC7135
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Feature of Tower Crane TC7135
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC7135 Specifiction
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:If you were to give someone a paper crane with an ayat or hadith (has to be short, as I have to write on its wings)... what would you write?I was thinking of writing this:Peace be upon you for what you patiently endured. And excellent is the final home. [13:24]I'm not sure though...lol. Any ideas? Salam.
- I like these To thee have We granted the Fount (of Abundance). Al-Kauthar – ( 108:1 ) Say: I seek refuge with the Lord and Cherisher of Mankind An-Nas - ( 114:1 ) By (the Token of) Time (through the ages), Verily Man is in loss Al-‘Asr – ( 103:1-2 ) Say: I seek refuge with the Lord of the Dawn Al-Falaq - ( 113:1 ) Read in the name of your Lord who created, Created man from clots of blood. Iqraa - ( 1-2 ) Say : O ye that reject Faith! I worship not that which ye worship Al-Kafirun – ( 109:1-2 ) And seek help in patience and prayer al-Baqarah - ( 2:45 ) Eat and drink, but waste not by extravagance al-A’raaf - ( 7:31 ) And whenever you give your word, say the truth al-An’aam - ( 6:152 ) Edit My Favorite Quotations “Heaven lieth at the feet of mothers.” Prophet Muhammad P-B-U-H “The ink of the scholar is more holy than the blood of the martyr.” Prophet Muhammad P-B-U-H A good dream (that comes true) of a righteous man is one of forty-six parts of prophetism. Prophet Muhammad P-B-U-H A true good dream is from Allah, and a bad dream is from Satan. Prophet Muhammad P-B-U-H Whoever sees me (in a dream) then he indeed has seen the truth. Prophet Muhammad P-B-U-H When I want to read a novel, I write one. Benjamin Disraeli Imagination is more important than knowledge. Albert Einstein The value of a man should be seen in what he gives and not in what he is able to receive. Albert Einstein Wars come and go, but my soldiers stay eternal. Anonymous
- Q:I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
- It's a cane not a crane. Whew! To summarize, what happened to House's leg was that there was muscle death of the leg. He should have had it amputated, but he didn't. Instead, he wound up with a nearly useless, and chronically painful leg. Stacy, as a participant in this demise, well, I guess the relationship was all downhill from there. House realizes it was all his fault. If he would have just got the amputation, he wouldn't have screwed it all up Stacy is his ex-wife.
- Q:HSE Officers can better answer this question or a qualified Crane operator it self can explain.
- each crane is so different. it depends on the rated crane load, the lifted distance from the crane and actuall load to be lifted. Each crane an envelope of angles to the horizontal, lifted load, and distance from the crane. The crane operator must insure that he is within this envelope or the crane may topple over. Also, the wind at the time of the lift must be considered. If you can picture a seesaw with loads pivoting about a fulcrum. When two people are on the seesaw, one person is the crane and the other is the load to be lifted. Only in the case of a crane, the fulcrum is at the crane itself with a large dead load counter weight behind the cab operator.
- Q:can anyone help me in telling me how to construct an electromagnetic crane or help me find a website which helps with the steps in constructing one. thank you
- Take a metallic bolt, and wind many turns of insulated copper wire around it, and connect one end of the wire to a battery, the other end to the other terminal of the battery through a switch. Now, whenever you press the switch, the bolt gets magnetised, and thus works as a crane (u can use it to lift small pins etc.) When you want to drop the pin, release the switch, the bolt gets demagnetised, and voila!
- Q:I have preliminary data: up to 2 tons of weight; work range of 40 meters; lifting torque 800KNm; lifting height 45m.. I encountered problems in the design, and some of its specific reference, I would like to ask here, for example, how much is the weight of its whole machine, how much is the balance weight, the balance of the radius of gyration? Super boom weight? (it's better to have the approximate weight of each component). And when I design this tower crane, is it necessary to use planetary gear for the gear reducer?Thanks to your advice, Liu is here to thank you
- The weight of the whole machine is 36.1 tons (independent height). Its balance weight is 15 tons, and the balance weight is 11.82 meters. The boom weight is 5.72 tons. It is necessary to use planetary gear.Usually use two rotary speed reducer of 8000 nm.
- Q:What type of tower crane does not include tower crane in variable amplitude mode?
- Tower crane, tower crane.Tower crane according to its different types, there are the following classification methods.(1) divided by structure type of fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.Mobile tower crane: a tower crane with running device and can walk.
- Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- Usually it is the rigger who attaches the lifting gear not the crane operator who needs to know about centriods and even then the real trick is getting the slings or other lifting devices in the exact place. That tends to be a bit of trial and error unless the lifting points are clearly marked.
- Q:Were the anti-gravity machines used to build the pyramids levers, winches and cranes?
- Levers winches and cranes all use a counter balance. Its weight that helps move weight in different ways. There is no such thing as an anti-gravity machine.
- Q:A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
- The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
- Q:Every day to see the site of the tower crane, and increased with the increase of buildings, but it is very strange. By what means, in the process of how to increase Balance Master, please explain.
- With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC7135 Double-trolley 16T 71M
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords