• TC6014 8T Tower Crane Equipment with CE ISO Certificate System 1
  • TC6014 8T Tower Crane Equipment with CE ISO Certificate System 2
TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1, TC6014 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 62m, TC6014tower cranes are famous for their large operating ranges, varied working methods and wide uses.

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

TC6014 8T Tower Crane Equipment with CE ISO Certificate

Tower crane Specifiction

TC6014 8T Tower Crane Equipment with CE ISO Certificate

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

About CNBM

 

CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q:Is the tower crane a special type of work?
The crane driver, scaffolder, welders and other special types are
Q:What are the types of common tower cranes?
(3) according to erection methodNon self erecting tower crane: a tower crane assembled and erected by other lifting equipment.Self erecting tower crane: a tower crane that relies on its own power unit and mechanism to realize the transition between the transportation state and the working state.(4) according to variable amplitude methodThe trolley jib tower crane lifting trolley along the tower crane luffing boom for operation.Boom luffing tower crane: luffing tower luffing luffing luffing crane.Folding tower crane: tower crane which can be bent by boom according to the needs of lifting operation. It can also have the performance of luffing and luffing.
Q:Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.
Q:In Batman Begins.I'm guessing something in the Psychology area...?And what courses would you need to take to have the same career.
I just watched that movie last night :) I would say that Crane is a criminologist which is the the scientific study of crime and criminal behavior and law enforcement. In which you would need to study psychology and sociology. Many colleges also have a criminology major. If not, then I would say that he is a psychiatrist (a medical doctor that deals with workings of the mind) who is used as a consult by the Gotham City Police Department. To be a psychiatrist, one needs a medical degree, and to also study psychology and sociology. However, to by a psychologist, you don't need the medical degree. I want to major in psychology, so I've done this research haha. Hope this helps!
Q:How much do you know about construction cranes??
that depends, what do u need to know
Q:who invented them and why do people make them?
in Japanese folklore if you fold a 1000 origami cranes you get are granted a wish, usually concerning health/long life. The peace part comes from the story of Sadako Sasaki a victim of the Hiroshima atomic
Q:I got the crane gold 1.6 roller rocker I'm trying to install on my 95 z28 w/ an lt1 and it doesn't seem like they are installing quite right. I got the tall black nuts that hold the rocker down around the stud and the pushrods, that's it. Do I need to use those things that go below the rockers themselves (the things that slide over the stud and the rocker goes over it from the original rockers) or do I just install how I already am with just the crane rockers, black nuts and pushrods?
on the LT1 they come factory with screw in studs so the crane application should go without any problems the rocker the rocker guide from crane should slide right on to stud you don't use the old rocker guide for that
Q:Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q:when high rise buildings are built a crane is erected to lift iron and cement up. How do they erect these cranes?
Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
Q:Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords