60MVAR/750kV reactor for Northwest power grid
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | HeBei(Mainland) China (Mainland) | Brand Name: | CNBM | Model Number: | 60MVAR/750kV |
Usage: | Electronic,power | Phase: | Three | Coil Structure: | Toroidal |
Coil Number: | Autotransformer,Other | Packaging Details: | Sea Worthy Packing |
Packaging & Delivery
Packaging Detail: | Sea Worthy Packing |
Delivery Detail: | 2-5months |
Specifications
Arc furnace transformer
1 EAF transformer
2 ISO9001,ISO14001,OHSAS 18001, CE
3 Apply for IEC, ANSI
4.KEMA, CESI ,CTQC t
•Main function and features
Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents which are the main products of Shenda Electric with many advantages both on quality and price. As an example a 30MVA unit at 150V would result in a secondary current of 115 kilo ampere. For these high secondary currents special bushings are required to be connected to the bus-bars. These bushings are specified with very specific arrangements to suit the bus-bar arrangement and cooling system. Furnace bus-bar are mostly water-cooled. The cooler are either of the oil forced (OFAF) or Oil forced water OFWF).
Shenda electric is renowned and appreciated by its reliable products performance and integrated services.
Features:
1) Low loss
2) Low noise
3) High efficiency
4) Low partial discharge
5) Strong mechanical strength and short-circuit withstand ability .
6) Operation reliability
7) Easy maintenance
8) Pretty outline and compact structure
9) 100% guaranteed no leakage
Brief specification
1) Voltage class: 6~110 KV
2) Capacity : 630 KVA to 120,000 KVA
3) Short-circuit impedance : 4.5~21%
4) Losses : No-load losses is fully comply with IEC standard requirements
Application:
Arc furnaces are used in steel industry for smelting scrap iron and for refining steel. Other application areas are :
1) Smelting glass and ceramics
2) Manufacturing or refining many other materials etc. ferrochromium, ferromanganese, different abrasive materials (oxides and nitrides), semiconducting base materials, nanopowders etc.
3) Electric arc furnace (EAF) transformers are required for many different furnace processes and applications . they are built for :
a , Steel furnaces, mainly long arc
b, Landle furnaces
c, ferro-alloy furnace and similar with short or submerged are
d,Smelting of other materials
Our Services
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. make manufacturing plan, testing plan,and shipping plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b, send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testinng.
d. book hotel and ticket for customer if they will come do FAT.
3. After sale service
a. installation and commissioning
b. training the workers
b. quick response within 12 hours any time
d, provide 12 months gurantee period normally.
- Q:What is the power equipment in the distribution room?
- The indoor power distribution room with low voltage load is called the power distribution room,
- Q:Are electric wires and cables belong to distribution equipment?
- Distribution equipment (Electrical Equipment) is in the electric power system of HV switchgear, generator, transformer, power circuit, circuit breaker, low voltage switch cabinet, distribution board, switch box, control box and other equipment collectively.
- Q:CHINT group in the transmission and distribution equipment to do it?
- The national grid is not purchasing some equipment of CHINT, CHINT group is now very powerful
- Q:Transmission and transformation equipment
- High voltage has a very high risk, and the target electrical appliances do not need such a high voltage, which needs to reduce the voltage through the transformer
- Q:Rural high voltage transmission line equipment ownership
- the transformer can be what, look at the role of electrical appliances can be
- Q:What are the two power distribution equipment?
- Primary equipment is the equipment used in the main system of transmission, transmission and distribution
- Q:An introduction to the interpretation of flexible AC transmission systems
- The series compensation device such as thyristor controlled series capacitor (TCSC), thyristor controlled reactor (TCSR), static synchronous series compensator (SSSC), active power flow is mainly used to change the system of distribution, improve the system transmission capacity and transient stability etc.;
- Q:What is the transmission line, what is the power distribution equipment
- As the name implies, the transmission is by the power plant or power center regional power grid (sending end), to the load center power grid (by the end) of the transmission of electricity; power distribution is to be distributed by the substation or bus power down.
- Q:What are the distribution network equipment
- The transmission function of the power plants issued by the electricity to power consumption areas, or between adjacent grid power to send each other
- Q:High and low voltage distribution equipment
- High voltage distribution equipment: high voltage fuse; high voltage isolation switch; high voltage load switch; high voltage circuit breaker.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
60MVAR/750kV reactor for Northwest power grid
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 1 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches