Geomembrana Pvc

Hot Products

FAQ

nan
First, scratch a corner with fingernails. And then slowly tear down the film along corner. I suggest you take it to professional place to handle because it will look ugly if you stick the film up again after tearing it down.
PDHE impermeable membrane in what season can not be built
Is HDPE geomembrane. Preferably in more than 4 degrees of environmental construction. Geomembrane requirements of the temperature tolerance is minus 77 degrees, but the winter temperature below zero temperature affect the quality of welding.
Geomembranes contribute to erosion control in dam and reservoir construction by acting as a barrier between the water and the soil. They prevent water from seeping through the soil and causing erosion, thereby ensuring the stability and integrity of the dam or reservoir structure. Additionally, geomembranes can also be used to line channels and slopes, further reducing erosion potential by providing a protective layer against water flow and saturation.
nan
creeping welder welding
nan
The national standards of geomembrane is GB / T17642-2008. Geomembrane 1. longitudinal and transverse breaking strength. 2. Vertical and horizontal elongation corresponding to the standard strength. 3. CBR bursting strength 4. 5 vertical and horizontal tearing strength. 5, hydrostatic pressure resistance. 6. peel strength. 7. vertical penetration index. 8, width deviation, the above technical requirements that confirm to the national standard are national standard geomembrane.
nan
The electric heating film is made of a special conductive macromolecule material which is matched with a metal current carrying strip, and the heat is melted and pressed between the insulating film body. It is often used as heating elements. Electrothermal?film heating system is composed of : electrothermal?film panel, T-type cable, insulated waterproof quick connector plug, temperature controller, temperature sensor, automatic control reactor and other components. .
nan
You can just use the preservative film. 1. Pulling the preservative film from its packaging and putting the film on the smoke exhaust hood. Cutting off the film with a blade when the film is stuck to the edge. 2. Pressing and strenghtening the film on the smoke exhaust hood. 3. Sticking the preservative film all over the oil box of the smoke exhaust ventilator. When there is lot of oil, the old film can be repalced by the new one to avoid cleaning the ventilator. Here are some tips. 1. When the preservative film gets dirty, you can just replace it with a new piece. 2. Usually, the film can be changed once a month. 3. In the kitchen, when sticking the film, it is best to pull the film in its package without pulling the membrane core out so that the film can be stuck flat and easily cut off.
nan
Geomembrane is very good. the lotus root pool generally use 0, or soil, with a lot of brands, the paving direction should be split joint, and then laying the geomembrane, you can also use glue stick to paste pvc board from the market, (you also can prepare a few sandbags, almost .0,which can be used, we can use a hot air gun to weld, all hand hit, and it can be used.