C Channel 100X50X5

Hot Products

FAQ

How to construct double - sided double gypsum board partition wall
Installation of vertical keel, light steel vertical keel. Keel must be vertical, vertical keel inserted at both ends along the top keel and along the keel, adjust the vertical and positioning accuracy, with a core pulling rivets fixed.
Light steel keel gypsum board partition wall construction practices and construction process What is the difference?
And traditional wooden keel wall for comparison? Basically, the framework is different, flatness is different, the cost is different.
Light steel keel wall circuit how to wear pipe
Install the crossed keel (lower threshold). Fixed with a nail, or first drilling, and with the expansion bolts connected to fixed. Installation should be installed according to the center line and edge, both ends of the top to the structural wall (column) surface, the final fixed point from the structure of the facade should not be greater than 100mm; nail or expansion bolt spacing should not be greater than 800mm. Installation should ensure that the keel level and straightness.
Light steel keel wall can be installed sliding door
940 door to install the sliding door a bit small, open only less than 500 after the space, I suggest you install the folding door
Light steel keel + gypsum board + surface brush latex paint partition wall per square meter offer is how much?
Light steel keel about 12-13 yuan, enough to do a square, gypsum board per square 16 yuan (double) or so, paint workers wages about 25 yuan. / Square (package workers package material); Labor costs about 18 yuan, all offer for 75 yuan or so.
Gypsum board wall is generally done to the height of the original roof or do the height of the ceiling?
Keel to the top, the finishes of the board can not to the top
Light steel keel partition wall construction process is what
(1) Pin line, sub-file: in the partition with the upper and lower and the two sides of the matrix at the junction, should be the width of the keel line. Battle clear, accurate location. According to the design requirements, combined with the cover panel of the long and wide sub-file to determine the vertical keel; transverse and additional keel position. (2) for the pillow: when the design requirements, according to the design requirements for the concrete pillow. For the pillow should be supporting mold, bean stone concrete should be pound dense. (3) fixed along the edge, along the keel; along the line position fixed along the edge, along the keel, can be fixed with nails or expansion bolts, fixed point spacing should not be greater than 600mm, keel docking should remain straight.
Light steel keel partition wall how to get, and how to purchase materials and tools, I now empty-handed, the best comprehensive ~!
Like your height of the wall, you can choose the C75 series of light steel keel, if you have to take into account the water seepage you can use waterproof gypsum board (face layer paper is green, ordinary is gray) As for the installation like home this Do not need to use the impact of drilling holes. Put a good, can be directly in the light steel keel in the ground to the keel skulls assembled to install in place, on the top of the keel placed woodworking plate, directly into the nail into the nail, of course, the gun was selected models of the same big. The side is also so fixed on the wall. The gypsum board is fixed on the light steel keel by self-tapping screws