• Uninsulated Flexible Duct -C System 1
  • Uninsulated Flexible Duct -C System 2
  • Uninsulated Flexible Duct -C System 3
Uninsulated Flexible Duct -C

Uninsulated Flexible Duct -C

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
20FCL pc
Supply Capability:
10000 pcs per Week pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications of Uninsulated Flexible Duct -C

Diameter Range:  80-750mm (3〞-30〞) 

Temperature Range:  0 ~ +100 ℃ 

Velocity of air flow(max):  30 m/s 

Working Pressure:  2500 Pa 

Standard Length:  10M

 

Applications of Uninsulated Flexible Duct -C

Ideal for all air conditioning/ventilation systems, such as hospital, hotel, commercial building 

as well as and industrial and residential application.

 

Packaging of Uninsulated Flexible Duct -C

Packed with carton box. 

 Uninsulated Flexible Duct -C

 

Q:Drain flexible pipe to keep the base design above the elevation of the number of meters
, there are cloth-based materials, such as Teflon cloth, etc
Q:For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
According to the provisions of Article 103 of the "Tower Crane Safety Regulations", the tail of the tower crane is not less than 0
Q:Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
Is the CAD map, find their own materials do not have a
Q:Do you have a natural gas hose in the flue?
Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
Q:What is the effect of concrete pouring on the construction quality?
Our usual way is to fight the fuse.
Q:Two hundred galvanized pipe should be under the large flexible tube
We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q:Talk about the class flexible management of the class teacher what the requirements
Hello metal hose made of stainless steel models are mainly single-button type P3 and double button P
Q:Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
Q:I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
First of all you have to check the pipe into the inspection, there are inspection data: product certification, the national inspection report, approach the size and quantity; at this stage to do the main inspection and inspection and shelter project inspection data, the need for quality The person in charge of the signature, the supervision engineer signed, you find some of the wages of the official Gongjia pull the yellow rule of the sea to see the sea, there are templates on the top, you can go to Sina love to download the knowledge.
We are a well-known brand, we specializing in the production and sales of high-grade flexible duct.

1. Manufacturer Overview

Location Shanghai, China
Year Established 2005
Annual Output Value Above US$ 2 Million
Main Markets 20.00% Mid East
20.00% Europe
60.00% Asia
Company Certifications ISO9001

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 60%
No.of Employees in Trade Department 50 People
Language Spoken: English; Chinese
b)Factory Information  
Factory Size: Above 300,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered; Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords