• Tower Crane TC7034 Max. lifting Weight 12T System 1
  • Tower Crane TC7034 Max. lifting Weight 12T System 2
  • Tower Crane TC7034 Max. lifting Weight 12T System 3
  • Tower Crane TC7034 Max. lifting Weight 12T System 4
Tower Crane TC7034 Max. lifting Weight 12T

Tower Crane TC7034 Max. lifting Weight 12T

Ref Price:
$40,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Structure of Tower Crane TC7034 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 12T                            

Max Tip Load:3.4T                          

Independent Height:50M

Max Lifting Height: 200M                      

Span: 70m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC7034         

 

Packaging & Delivery of Tower Crane TC7034


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC7034


 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC7034 Specifiction


 

 

Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q:What is the safe distance of a tower crane to the surrounding buildings?
It's 5 meters up and down. Outside the radius of rotation is 3 meters, such as QTZ5010, tower crane rotating radius type, 50 meters in diameter, one hundred meters outside the scope is safe
Q:Where can I get the tower crane manufacturing permit?
Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
Q:I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
Seneca Crane was the head gamemaker in for the 74th Hunger Games. President Snow had him hung because he changed the rules to allow both Katniss and Peeta to win.
Q:Describe how a bottleneck event reduces genetic diversity in a population, and specifically how this has affected the current population of whooping cranes in the U.S
Well, a bottleneck reduces the number of organisms in a population or species down to a much smaller number than previously existed. In the case of the whooping crane, the species underwent a bottlenck event (although what it is I'm not sure), leaving us with less than 12 individual birds. The more widely accepted number of 6-8 birds has given rise to the several hundred whooping cranes alive today. Since only half a dozen sets of genes were used to create the several hundred, there is not much genetic variability.
Q:In the private training session, Katniss Everdeen creates a noose, hangs a practice dummy, and uses the paint to write: Seneca Crane. I know this name is mentioned earlier in the book, but I don't remember who Seneca Crane is... Remind me, please?
Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.
Q:Are there any NECs that let them do so? Maybe Minesweeping Bosn Mate?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www lic.navy.mil/bupers-npc/re...
Q:What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well Im not into quantum physics much these days, but in his book Life and Light Lee Smolin proposes that if the quantum theory of gravity has two special features the universe would fine tune itself! If we perturb a Kerr-Newmann black hole so that the new universe will really form on the other side, and that the constants of nature might fluctuate in such a process so that the new universe would have sightly different physics than our own. Its well over my head at this stage; cause Im just an N.Y.U.K. graduate! NYUK NYUK NYUK Anyone wants to read up on it can go to the link below.
Q:Was it Ichabod Crane or Rory Emerald who got the jeepers creepers scared out of them by a headless horseman?
ichabod crane but he also got his head cut off by the horse man so im sure it was him pluss he was the main charachter
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:I was wondering if this is possible. The wall we have designed is very close to an existing retaining wall. In order to properly form and waterproof the wall we would have to demo that existing retaining wall. My idea was to build it off site, waterproof it, and then crane it into its location. Is this possible? any similar methods? thanks
Possible but difficult. You could tell us what the wall is made of? Assuming stone, then you can't lift a stone wall unless you have a steel plate under it, as it will collapse otherwise. That gets complicated. Yes, you could build it with a 1/2 inch steel plate under it, and lift it that way, assuming it is not too long, and crane it into position, but you then have to slide the plate out without cracking the wall, also difficult. The plate is expensive, the crane is expensive. But what do you gain? You still have to demolish the old wall, you still have to build a new one, so what would you gain by building it somewhere else and moving it?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords