• SIH:S hydraulic system Excavator SH210-5/SH210LC-5 System 1
  • SIH:S hydraulic system Excavator SH210-5/SH210LC-5 System 2
  • SIH:S hydraulic system Excavator SH210-5/SH210LC-5 System 3
SIH:S hydraulic system Excavator SH210-5/SH210LC-5

SIH:S hydraulic system Excavator SH210-5/SH210LC-5

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Description of excavator:

 

Modern, hydraulic excavators come in a wide variety of sizes. The smaller ones are called mini or compact excavators. For example, Caterpillar's smallest mini-excavator weighs 2,060 pounds (930 kg) and has 13 hp; their largest model is the largest excavator available (a record previously held by the Orenstein & Koppel RH400) the CAT 6090, it weighs in excess of 2,160,510 pounds (979,990 kg), has 4500 hp and has a bucket size of around 52.0 m³ depending on bucket fitted.

 

Engines in hydraulic excavators usually just drive hydraulic pumps; there are usually 3 pumps: the two main pumps are for supplying oil at high pressure (up to 5000 psi) for the arms, swing motor, track motors, and accessories, and the third is a lower pressure (700 psi) pump for Pilot Control, this circuit used for the control of the spool valves, this allows for a reduced effort required when operating the controls.

 

The two main sections of an excavator are the undercarriage and the house. The undercarriage includes the blade (if fitted), tracks, track frame, and final drives, which have a hydraulic motor and gearing providing the drive to the individual tracks, and the house includes the operator cab, counterweight, engine, fuel and hydraulic oil tanks. The house attaches to the undercarriage by way of a center pin. High pressure oil is supplied to the tracks' hydraulic motors through a hydraulic swivel at the axis of the pin, allowing the machine to slew 360° unhindered.

 

Specifications of excavator:

 

Working Range

Arm length1.90 m2.40 m2.94 m
Boom length5.70 m
A ( Max.digging radius )8 960 mm9 420 mm9 900 mm
B ( Max.digging depth )5 610 mm6 110 mm6 650 mm
C ( Max.digging height )9 160 mm9 410 mm9 610 mm
D ( Max.dumping height )6 330 mm6 590 mm6 810 mm
E ( Max.vertical wall cut depth )5 010 mm5 500 mm5 960 mm
F ( Min.front swing radius )3 580 mm3 600 mm3 600 mm
G ( Rear end swing radius )2 750 mm

Dimensions

SH210-5 (SH210LC-5)
Arm length1.90 m2.40 m2.94 m
A Overall length9 490 mm9 480 mm9 400 mm
B Length from center of machine (to arm top)6 770 mm6 760 mm6 680 mm
C Upper structure rear end radius2 720 mm2 720 mm2 720 mm
D Center to center of wheels3 370 mm
(3 660 mm)
3 370 mm
(3 660 mm)
3 370 mm
(3 660 mm)
E Overall track length4 180 mm
(4 470 mm)
4 180 mm
(4 470 mm)
4 180 mm
(4 470 mm)
F Overall height3 090 mm3 190 mm2 970 mm
G Clearance height under upper structure1 040 mm1 040 mm1 040 mm
H Shoe lug height26 mm26 mm26 mm
I Cab height2 940 mm2 940 mm2 940 mm
J Upper structure overall width2 770 mm2 770 mm2 770 mm
K Width from center of machine (left side)1 430 mm1 430 mm1 430 mm
L Width from center of machine (right side)1 340 mm1 340 mm1 340 mm
M Track gauge2 200 mm
(2 390 mm)
2 200 mm
(2 390 mm)
2 200 mm
(2 390 mm)
N Overall width2 800 mm
(2 990 mm)
2 800 mm
(2 990 mm)
2 800 mm
(2 990 mm)
O Std.Shoe width600 mm600 mm600 mm
P Minimum ground clearance440 mm440 mm440 mm
Q Handrail height2 960 mm2 960 mm2 960 mm

Principle Specifications

 SH210-5SH210LC-5
  STD Specifications
BaseBoom length8.70m
Arm length6.40m
Bucket capacity (ISO heaped)0.37m3
Std.operating weight20 000kg20 400kg
EngineMake & modellSUZU AJ-4HK1X
Rated output117.3kw/1800 min-1
Piston displacement5 193 ml(cc)
Hydraulic SystemMain pump2 variable displacement axial piston pumps with regulating system
Max. pressure34.3 Mpa
(with auto power boost)36.8 Mpa
Travel motorVariable displacement axial piston motor
Parking brake typeMechanical disc brake
Swing motorFixed displacement axial piston motor
PerformanceTravel speed5.6/3.4 km/h
Traction force201 kN (20,496 kgf)
Grade ability70%<35º>
Ground pressure45 kPa42 kPa
Swing speed11.5 min-1
Bucket142 kN
/with power boost152 kN
Arm103 kN
/with power boost110 kN
OthersFuel tank410 liter
Hydraulic fluid tank240 liter

Images of excavator:

FAQ of excavator:

Q: What are the main functions of excavators?

A: Excavator is the machine that can excavate the the soil of various types forcefully and then using hydraulic system a hydraulic force is generated and utilizing this force bucket is exchange with some other attachments then excavator can be used for multi-purpose. For exemple pile diver, hydraulic jack hammer etc...

 

Q: What are the main type of excavators?

A: Crawler excavator; Wheel excavator;

 

Q: What is the application of excavators?

A: The excavator has increased the work speed tremendously. It is used extensively in numerous fields, including the following:

•Wood removal in forests

•Normal grading work and landscaping

•Cutting of brushes with attachments

•Demolition of structures, and removal of debris

 

Q:I am not sure what I want to do for my career and I am a senior in high school about to graduate. I do know that I LOVE everything to do with Latin and Greece, but Latin is sort of disappearing. So i was wondering if there were jobs that you could point me in the direction? Thanks
Teach. I honestly cannot think of anything else. And I do research on careers almost daily. Note: I hope you are going to college. If so, make sure you do not spend too much money on your degree. It will be HARD to find any job, and the pay will be low. Also know without college, there are no jobs in this. You get to work fast food or retail. --- Additional note: I never remember having a class on latin or greek history. You might be going into a seriously tough field to find a job.
Q:Construction units excavator access, what materials should be submitted to the supervision unit?
The equipment entrance check list should be reported to the supervision team
Q:My wife and I would absolutely love to have an inground swimming pool in our back yard. When looking at cost... it seems it will end up being around $30,000. When seeing how expensive it was, we decided to check into pool kits where you can install them yourself. I find myself to be a handy man and wouldn't mind the labor. How hard is it to actually install one of these pools yourself?(all answers welcomed but someone with experience in this topic preferred)THANKS!!!
This Site Might Help You. RE: How hard is it to install your own inground pool? My wife and I would absolutely love to have an inground swimming pool in our back yard. When looking at cost... it seems it will end up being around $30,000. When seeing how expensive it was, we decided to check into pool kits where you can install them yourself. I find myself to be a handy man and...
Q:So when is my new dump truck and excavator going to fall out of the sky and into my lap so I can do gov work?
Dont worry, u will get your wonderful government job and it will last a full 2 months then the Great One will fire u and everyone else including me lol
Q:Please use detail.
Oh, it was a person. In college, shared an apartment with 3 other guys. One guy did not believe in showers or soap. The smell was soooooo bad!
Q:I am a good mechanic and have a very good experience of dozer and crane excavator maintenance can somebody help me find a good job
My hubby tried SMC.. its not all that good. Its just a drop shipment membership. You will owe them money when you have not made a dime. Don't do it unless you got the money to spend. At anyrate... you can try USAjobs , try America's job bank, there's a lot of construction jobs about to happen with the stimulus package hitting the states ...they will temporarily start reconstructing and repairing old bridges and streets and etc...
Q:Im 17 years old and im looking for employment just somewhere simple that any kid in highschool would work.this is the first resume i've ever written and i was just looking for some feedback and advice for areas of improvement. basically what i want to know is if you were a hiring manager and you looked over my resume would you call me in for an interview?
Looks way better than my resume at age 17 I tell you that. Here are some suggestions Make your experience description in bullet points similiar to your volunteer and interests. Use action verbs like initiated, lead, pursued.. words that show you are proactive. For example: Construction: - Activity 1 (construction of roofs, floor, ....) - Activity 2 (cleared forest vegetation....) - Responsiblity 1 (list if you had any) - Projects finished 1 (cleared entire section of forest, finished an entire house.. etc..) Do this for each place you have worked. Also, make sure you list your most recent experience at the top because employers will want to see them first. The lines about able to stand for hours, work well alone or with others, motivated, etc.. You can remove them and put it a cover page if you have one. Because they sound cheezy and the fact that EVERYONE says that. Most employers don't even read them. Your objective should be focused. Not bus management, or culinery arts, or retail. Pick one depending on your employer, you should focus on one. This way your resume will seem more directed at the position, rather than a generic resume that you mass produce.
Q:My husband and I are building a new home and our septic design is for a 5 bedroom home. The excavator is calling for 500 tons of white quartz sand. 500 tons is a lot. Can anyone tell me if that is a rational amount?
doesn't seem overly stated. sand runs about 2500lb per yard,18 yards on a truck.it all depends on the slope you have and the rise you end up with.not sure the code where your at but you will need approximately the same amount of black dirt as you need in sand possibly 36 yards less.
Q:How long does the excavator take on the moon?
depending on how many people you have the time may very from 30mines-2hours
Q:please help
Open-pit mining (as opposed to underground mining) has several advantages:- 1) Low cost of recovery - large trucks can enter the mine, get filled up with rock from a large excavator and drive away to the processing plant. 2) No need to leave stability pillars, necessary to hold up underground mine workings but which may contain valuable ore that is effectively lost to the mining company. 3) Ease of beneficiation - surface mines are usually composed of materials (oxides in the case of metalliferous mines) that are easier to handle and easier to treat in order to recover their marketable product as a result of being so close to surface. 4) Safer environment - so much less problem of rock falls, hanging wall collapse resulting in a lower injury rate than in underground mine.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords