• One component  Polyurethane Waterproof Coating System 1
  • One component  Polyurethane Waterproof Coating System 2
One component  Polyurethane Waterproof Coating

One component Polyurethane Waterproof Coating

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
5000 kg
Supply Capability:
20000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Polyurethane Waterproof Coating Description:

One-component polyurethane waterproof coating , also called the moisture-curing polyurethane waterproof coating, is a kind of reactive wet curing film waterproof coating. When using,it coat at the waterproofing basic level, through reacting and moisture in the air  and got behind by the tenacity, soft and jointless rubber waterproof membrane.

2.Main Feature of  Polyurethane Waterproof Coating:

•Excellent mechanical properties, low temperature performance, convenient construction, coat without seams, good adhesion and flexibility, convenient maintenance, etc.;

•High solid content,  no  producing and precipitation of volatile substances in construcction and after construcction, no harm for the builders and the environment;

•No need the ingredients, using out-of-the-box, no affecting measurement error and quality;

•The color is adjustable to meet different customer human requirements for surface color.

3.Polyurethane Waterproof Coating Specification:

The tensile strength   Mpa ≥        2.45
Elongation at break % 45
Low temperature flexible    φ10mm                          No crack at 10℃
impervious    (0.3  Mpa,30MIn) NO

4.Polyurethane Waterproof Coating  Images:

One component  Polyurethane Waterproof Coating

Q:What is PE waterproof cloth and PVC tarpaulin
The characteristics and performance index of waterproof cloth products 1. Tensile strength index: warp strength ≥ 2100N / 5CM, zonal strength ≥ 1600N / 5CM; 2. No leakage of water, water pressure ≥ 2000MM water column; 3. Low temperature, cold temperature -20 ℃; 4 Can be mildew, mildew experiment for the first level. Product Usage 1. Can be used car, train, ship cargo tarpaulin; 2. It can be used for the open storage of the harbor airport at the station terminal harbor; 3. Can be set up temporary granary and a variety of crops covered with open-air; 4. Can be used for construction site power construction site and other sites to build temporary shed, temporary warehouse materials; 5. Can be processed camping with tents and various machinery and equipment outside the jacket.
Q:Can acrylic materials be perforated? How to do waterproof after punching?
Or in the back with glass adhesive paste anti-corrosion nine PCT board (if the hole is flat, Anti-corrosion nine PCT is to remove the other side of the paste surface with asphalt anti-corrosion paint brush)
Q:What material waterproofing can be mixed with cement sand
Waterproof layer used in the cement label of not less than 32.5MPa, the thickness of cement mortar should be 2-3cm, the surface clean and solid without cracks; mortar leveling layer of cement should not be less than 32.5MPa, leveling layer to smooth compaction, finished product maintenance is not low In 5 days.
Q:Finished house bathroom waterproof household acceptance should be how to accept?
4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
Q:FRP finished brush on what can be waterproof do not fade
With glass fiber reinforced plastic + color paste even after the use of. Can be waterproof.
Q:Bathroom first leveling or do waterproof, what is the difference
7. The threshold stone is only decorated, do not mistakenly believe that can hold water. In short, each process have to carefully do not leave a hidden trouble to ensure worry. But the reality of the structure, materials, workers, mutual protection and many other unsatisfactory, so that waterproof is a common problem, perhaps set (overall) bathroom by the factory as a whole production test, on-site assembly will solve this common problem.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
2, the mold of the nail set: in accordance with the pre-scheduled area along the painted bottom line nail with polyethylene film wrapped wood mold. Mold to be flat, with the basic nail implementation, to prevent leakage material.
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
4, select the appropriate waterproof material, generally designed for waterproofing membrane.
Q:Home improvement waterproofing problem
1, you said the above three products are old products. It is recommended to use the latest dosage form of cf-2000 efficient composite waterproofing agent, is the latest cement-based crystalline products. Not only then to solve the leakage problem, and the composite waterproof agent in the active material in the water or moisture under the action, but also continue to penetrate into the concrete layer. The formation of 10 cm from the self-waterproof layer. If the self-waterproof layer due to external factors caused by small cracking, as long as there is water through, you can start the active substance of the secondary repair function, to automatically repair the crack water seepage.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords