hydraulic system Excavator SH75X - 3B
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Specifications
Working Range
Arm length | 1.71 m | 2.12 m |
---|---|---|
A ( Max.digging radius ) | 6520 mm | 6900 mm |
B ( Max.digging depth ) | 4140 mm | 4540 mm |
C ( Max.digging height ) | 7330 mm | 7620 mm |
D ( Max.dumping height ) | 5250 mm | 5540 mm |
E ( Max.vertical wall cut depth ) | 3640 mm | 4100 mm |
F ( Min.front swing radius ) | 1785 mm | 2085 mm |
G ( Rear end swing radius ) | 1235 mm | |
H ( Max.lift above ground ) | 415 mm | |
I ( Min.drop below ground ) | 205 mm |
Dimensions
SH75X-3B | ||
---|---|---|
Arm length | 1.71 m | 2.12 m |
A Overall length | 5915 mm | 5910 mm |
B Length from center of machine (to arm top) | 4492 mm | 4487 mm |
C Length from center of machine (to shoe top) | 1425 mm | |
D Center to center of wheels | 2210 mm | |
E Overall track length | 2845 mm | |
F Overall height | 2900 mm | 2950 mm |
G Clearance height under upper structure | 745 mm | |
H Shoe lug height | 20 mm | |
I Cab height | 2700 mm | |
J Upper structure overall width | 2225 mm | |
K Width from center of machine (left side) | 1065 mm | |
L Width from center of machine (right side) | 1160 mm | |
M Track gauge | 1870 mm | |
N Overall track width with 450 mm 600 mm | 2320 mm 2470 mm | |
O Std.Shoe width | 450 mm | |
P Minimum ground clearance | 360 mm | |
Q Width of blade | 2320 mm | |
R Height of blade | 450 mm |
Principle Specifications
SH75X-3B | ||
---|---|---|
Base | Arm length | 1.71m |
Bucket capacity (ISO heaped) | 0.28m3 | |
Std.operating weight | 7920kg | |
Engine | Make & model | ISUZU AU-4LE2X |
Rated output | 40.0kw/2000 min-1 | |
Displacement | 2179ml(cc) | |
Hydraulic System | Main pump | 2 variable displacement axial piston pumps |
Max. pressure | 29.4Mpa | |
Travel motor | Variable displacement axial piston motor | |
Parking brake type | Mechanical disc brake | |
Swing motor | Fixed displacement axial piston motor | |
Performance | Travel speed | 5.1/3.3km/h |
Drawbar pull | 59kN | |
Grade ability | 70%<35º> | |
Ground pressure | 35 kPa | |
Swing speed | 9.5 min-1 | |
Bucket | 57 kN | |
Arm | 38 kN | |
Others | Fuel tank | 100 liter |
Hydraulic fluid tank | 97 liter |
Standard equipment
Hydraulic system
- High-performance return filter
- One-touch idle
- Changeable 2-speed-travel
- Rotational ABS
Safety equipment
- Rear-view mirror
- Gate lock lever
- Emergency escape hammer
- Seat belt
- Cab-top headlight
- Travel alarm
- Theft prevention dog-chain
- Boom holding valve
- Engine emergency stop switch
Cab/interior equipment
- KAB seat
- Large-size rounded cab
- Fluid mount
- Air conditioner
- Defroster
- Automatic lock for front facing window
- Automatic point wiper connecter
- Intermittent wiper with washer
- Reclining seat
- Cup holder
- Ashtray
- Room lamp
- Hat hook
- AM/FM Radio
Others
- Engine that complies with tear-3 exhaust emissions regulations
- EMS (Easy Maintenance System)
- Long life hydraulic fluid
- Front-face protective net for radiator
- Aluminum radiator
- Aluminum oil cooler
- Tool kit
- Grease gun
- Fuel filter
- Double-element air cleaner
- Q:How to adjust the flow of the main pump of Komatsu excavator?
- Should be adjusted displacement, huh, huh?.The regulator has a adjustable bolt, this is a power regulating pump, clockwise is power up, of course, is small counterclockwiseFormula: power = pressure multiplied by the flow in the engine speed will not be under pressure in the pump output flow more (note that the two pump together, at 90 degrees for an adjustment value, can not be adjusted too much, otherwise it will be my car phenomenon)In the middle of the two pumps, there is also a big number of adjusting bolts, this is to adjust the maximum tilt angle of the pump swashplate. Similarly, the greater the swashplate tilt angle, the greater the displacement of the pump. This is clockwise, the angle becomes smaller, and the counterclockwise becomes larger. I hope my answer will be helpful to you.
- Q:I'd like to elevate my backyard and it's going to involve 333 square yards of soil. Does anybody know how much it would cost to get a dump truck, a driver, and how much soil dump trucks carry?
- Ask some local excavators for a quote. The prices will flex as to where you are, how busy the companies are, how far they have to haul the stuff, current fuel costs, cost of the material and other issues.
- Q:the question is' the city of rubber ville plans to dig a rectanguler landfil. the landfil will have a base with demensions 700 ft by 200 ft and a depth of 85 ft.'1- how many cubi feet of garbage will the landfill hold?2- what information would you need to determine how long the landfil can be used until its full?3- an excavator was hired to dig the hole for the landfill. how many cubic yards of dirft will he have to haul away?i reaally dont get this!can you please explain 1, 2, and 3 to me??
- Well for number 1, simply find the volume by multiplying the given dimensions For number 2, you would need to know approxamitely the volume of trash going in daily, or something along those lines For the third, convert dimensions to yards, then multiply them? That's how I would do it, unless I misread the question
- Q:Having a problem to find the caterpillar 3066 to my 320 Lexcavator so maybe there is a different engine to fit with the 717674 ARRG number.
- Are you sure it's not 3306?
- Q:my friend bought an old 690B john deer excavator- but the bucket and arm cyls. are toast ! I got lots of parts #'s for him off the jd site but can't get the actual specs for the cylinders. any tips?
- If you're looking to replace the cylinders, just take some measurements from the old ones - however, you're not likely to find replacements that are exact enough to work properly. The cylinders might be made by John Deere, or they could come from Hitachi, which made a lot of JD excavator parts. If the cylinders just need resealing and rebushing, take them to a hydraulic shop - they can find the right seals and wipers, and they can hone them or re-chrome the rods if necessary.
- Q:AKERMAN EW150 is one of VOLVO former production for industrial excavator.
- Hope okorder
- Q:What are the salaries for 360 excavator operators in canada?
- People running diggers in Klondike goldfields make $18-25 an hour. depending on their experience.
- Q:I'm doing a science project, and I need to know what some of the good benefits of an excavator are. For those of you who don't know, an excavator is a big machine that people use in construction, you know, the big one that digs, look it up on google images lol. Anyways, if you know any benefits of an excavator are, please tell me. That would be great! Thanks.
- It's fast in the sense of doing a lot of digging quickly. It is also very strong, and it doesn't get tired as human diggers would :-)
- Q:I'm looking for someone to put in a driveway, trenches for lines, and remove stumps
- Angie's okorder
- Q:Dragon excavator 150 price
- 320DL advantages: similar models of the largest mining, durability, stability of the whole car, although high prices, but cost-effective. Disadvantages: large fuel consumption, short arm, resulting in some work can not be a molding, waste of time.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
hydraulic system Excavator SH75X - 3B
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Hot Searches
Related keywords