• Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel System 1
  • Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel System 2
  • Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel System 3
Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel

Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1500 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Cup lock scaffold is a new steel pipe scaffold of spigot joint. Scaffolding has the toothed bowl joint, it has the features of installation demolition rapidly and saving the energy, stable and reliable structure, the perfect equipped, widely using, large bearing capacity, safe and reliable, easy to machine, but not easily lost, easy to manage, easy to transport, etc, the working efficiency is improved highly.

  • Component: Standard, Ledger,Strengthened ledger, Transom Beam,Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.


2. The Advantages of Cup-lock Scaffolding:

  • Highly durable

  • Multifunction:

    According to the specific construction requirements, it can be installed the construction equipment which contains different groups of size, shape and bearing capacity of single and double row scaffolding, shoring prop, material hoisting frame, climbing scaffolding, cantilever rack and other functions of construction equipment..

  • Efficient:

    Avoid to use the nut to operate, the speed of installation and dismantle is faster 3 to 5 times than common, workers use a hammer to complete all assignments.

  • Strength bearing capacity: Stable and reliable structure, strength bearing capacity.

 

 

3. Images for Cup-lock Scaffolding:

 

 

Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel


Cup-lock Scaffolding for Large Building,HDG,with Q235 Steel

 

 

 4. FAQ

 

  • How to guarantee the quality of the products?.

  Our scaffold products mainly include: Kwik-stage System Scaffold, All-round System Scaffold, Cup-lock System Scaffold,   

  Frames Scaffold, Shoring System Scaffold, Aluminum Scaffold, Scaffold Accessories. Our Formwork products mainly  

  range: Standard Flat Formwork, Column Formwork, Special Formwork for Bridges/Highways/Tunnels.
  Scaffold products are widely exported to North America, South America, Europe, Australia, New Zealand, Africa, Mid- 

  east Region, South-east Asia, Japan, Korea, Hong Kong, Macao, etc. We have set up our warehouses in Los Angles,

  USA.


  • Packing & Delivery Term?

    Export standerd package or as customer's requirements.

  • Delivery Detail:

    10-25 days after receipt of payment.

Q:Hi guys!...ive had a scaffold piercing for a little over 2 weeks and when i got it done it bled quite alot...this obviously made some scabs...but every time i clean it the scabs come off and its starts bleeding again...and just before i posted this i found abit of puss like fluid round the back of it!I clean it twice a day and avoid touching it What have i done wrong :(Plus my mum is now like quot; i told you so quot; LolCheers :)
Ear cartilage piercings generally take longer to heal than lobe piercings. This is often due to a combination of things, such as the location of the piercing in the cartilage, the type of jewellery used and the tension that jewellery creates to the structure of the cartilage. Using biocompatible plastics (like PTFE), cleaning cartilage regularly, and increasing your intake of minerals will certainly benefit your piercing; however a piercing will almost always be doomed to failure if improper jewellery and poor planning are used and left unmonitored.
Q:Explain the principles of scaffolding?
Well first you open a book, then you do your own homework. And yes I work on scaffolding regularly.
Q:i had an industrial piercing 2 days ago and was just wondering roughly how long untill i can change the bar? ive seen a few i like and want to change the boring one asap,..also, do u think my ears look crowded??? i dont have any pictures but on my left ear i have earlobe, tragus and rook, and my right ear i have ear lobe, anti-tragus and industrial..just wondering what u think.. thankss x
Well it doesn't really matter what anyone else thinks as long as you like them, you are the one that has to live with them. and i would recommend leaving for about 4-6 weeks depending on how well and quick you heel as everybody heels different. ring the place were you had it done and they will be able to advise you more on it. Hope this helped
Q:JGJ 130-2011 also has a carpenter scaffolding specification, who has to share the upload thank you
Technical code for safety of steel tubular scaffold with couplers in construction of JGJ 130-2011
Q:How to calculate the cost of scaffolding
Scaffolding set up the cost of the market price of about 25, different types of scaffolding used for different purposes scaffolding
Q:A scaffold of mass 53 kg and length 6.5 m is supported in a horizontal position by a vertical cable at each end. A window washer of mass 80 kg stands at a point 1.7 m from one end.(a) What is the tension in the cable closer to the painter? _______________N(b) What is the tension in the cable further from the painter? _________________N
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q:Why does this discovery both confuse and frighten her?quot;The Scarlet Letterquot;
her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
Q:i need a peircing in my right ear can i do scaffolding my self? whats the risks?
NO 1 you dont have a hollow needle, with out one its not gonna make a hole by taking out the piece ear you wont pierced its just gonna push it over that thats gonna have it way easyer for infection 2 thats around alot of nerve you kinda have to know what your doing 3 even if you do know what your doing once you get it through the 1st hole your gonna want to stop cuz of the pain and you wont be albe to position yourself you way a professional would in order to be able to get it done fast 4 its really easy to get an infection with any piercing epically if its not done properly by a professional trust me i have seen some really nasty stuff wake into the shop asking for help and most of them all did it them selfs
Q:What is the tension in each wire?a.Left wire = 40 N; right wire = 160 Nb.left wire = 200 N; right wire = 80 Nc.Left wire = 160 N; right wire = 40 Nd.Left wire = 240 N; right wire = 120 NThank You!
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:What is scaffolding in ESL?
A scaffold is a type of support that you use before a building is finished and doesn't need support. In ESL, it means you don't begin with full submersion into the language like you would with a native at once, especially if the child is older. You use simple english, instead of regular free writing you might use more structured activities at first, and you teach the students how to use 'context clues' and how to figure out the parts of the language they don't know based on what they do know and the situational aspects. Of course, the scaffolding is supposed to be temporary, you gradually pull it away until there is no scaffolding.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords