Construction Hoist Passenger Material Elevator

Construction Hoist Passenger Material Elevator

Ref Price:
get latest price
Loading Port:
Dalian
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Building Hoist 

 

1.Feature: Construction Hoist                        

2.Payload(kg):2*2000                                          

3.Lifting Speed(m/min):0-60                          

4.Motor Power(kw): 2*2*15

5.Safety Device: 2*SAJ40-1.4                             

6.Cage: Double                                              

7.Counterweight: Yes

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)              

10.Model Number: Type:SCD200/200

 

Main Parts of Building Hoist 

 

 1.Enhenced frequency converter helps energy saving:Up to 40%;

 

 2.Stepless speed coversion,no impact during start and stop;

 

 3.Small starting current effectively solve the difficulty on start;

 

 4.Less mechanical wear and longer working life;

 

 5.Simple operation & Easy maintenance.

 

Building Hoist images

 

Construction Hoist Passenger Material Elevator

Construction Lifter SCD200/200 Hoists for Sale

 

Building Hoist Specifiction

Construction Hoist Passenger Material Elevator 

 

FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

Q:Can construction elevators be taken by people or by goods
According to GB 26557-2011, "a vertical guide for people with vertical navigation". 5.6 lift cage 5.6.1 general When the maximum number of passengers can be carried, the maximum amount of the ceiling shall be calculated according to the area of 0.2 square meters per person, and the weight should be calculated at 75 kg per person.
Q:Do the elevator need to be installed when the main project is in construction
Installation, of course. The general building should be installed at about 10 meters on the 4th floor, or the person will go up and down the time is dangerous, and there will be some materials that can't be carried by the tower, too slowly
Q:The construction elevator can only go up can't come down what happened
Does the motor have electricity when it falls? Look at the switch and the line first, then check the controller.
Q:Why do you ask the construction elevator to be a certain distance from the structure? Is very close to if not you can not bother to do delivery channel security protection or something, out of the elevator out directly, and attachment should be able to get more easily, to solve. Thank you very much!!
The country stipulates that the distance between the moving parts of the elevator and the building and the fixed construction equipment should not be less than 0.25 meters. It's mainly about safety.
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator is running in an abnormal condition, it should stop immediately and take effective measures to bring the ladders down to the ground floor. When the electric is out of control in operation, the stop button should be pressed immediately. The stop button is not allowed until the failure is ruled out.
Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
The inspection, inspection, inspection and acceptance of the inspection station shall not be put into operation
Q:How many kw is the sc construction elevator
A double cage, the three-drive is 11 * 3 * 2KW and the two drives are 12 * 2 * 2KW
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:The construction elevator is commonly used in the process of the project
The construction elevator is commonly used in the process of the project. It is best to give a time period You're just saying one of its USES, I want to know what is the stage of what is going on in the project
Q:Why is the construction elevator not up to the roof
The free end of the construction of the lift height is only 7.5 meters high, general construction elevator drive now is the case, so the hoisting cage height and drive around 4.5 meters high, the other national standard construction elevator ceiling limit moves, drive above about 1.8 meters away from the top of the rails. So it's the free end of the construction elevator that can't satisfy the roof. As long as they can set up effective adhesion measures, they can also get on the roof.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords