• Combine PVC Aluminum Foil Flexible Duts for HVAC Systerm System 1
  • Combine PVC Aluminum Foil Flexible Duts for HVAC Systerm System 2
  • Combine PVC Aluminum Foil Flexible Duts for HVAC Systerm System 3
Combine PVC Aluminum Foil Flexible Duts for HVAC Systerm

Combine PVC Aluminum Foil Flexible Duts for HVAC Systerm

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
300 litre
Supply Capability:
500000 litre/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.  Aluminum Foil Duct Description

The production technologies and products performance of aluminum foil facing have been up to international advanced level. The aluminum foil facing products are mainly used for HVAC system, refrigerators, building thermal aluminum foil facing insulation and laminated with glass wool and rock wool to increase the insulation function.

• FSK aluminum foil facing is mainly used for duct wrap in HVAC system and other fields, such as vapor barrier etc., and suitable for off-line lamination of glass wool or rock wool. By special processing, the facing will have excellent flame retardant property.

• Heat-sealing aluminum foil facing is used for duct wrap without applying extra adhesive and suitable for online lamination of glass wool and rock wool.

• The WPSK aluminum foil facing, whose structure is white polypropylene/ fiberglass scrim/ kraft is mainly used for metal building insulation and suitable for the insulation of ware-house, factory, supermarket, office and so on.

• Double sided aluminum foil facing vapor barrier, whose structure is aluminum foil/ high strength kraft /fiberglass scrim /aluminum foil and laminated together by special flame retardant adhesive, can be used for roofing, wall insulation of house, warehouse, cold storages, factory and others.

 

2.Main Features of the Aluminum foil duct

• Light weight

• High manufacturing accuracy

• High strength

• Small inertia resistance

• Strong heat dissipation ability

• Good visual effect

• High reflective insulation

• Heat resistant, water proof, stable at high temperature;

• environmentally friendly,no smell and not-toxic;

• Smooth and clear surface;

 

3.Aluminum Foil duct Images

 

COMBI PVC ALUMINUM FLEXIBLE DUCT

COMBI PVC ALUMINUM FLEXIBLE DUCT

COMBI PVC ALUMINUM FLEXIBLE DUCT

 

4.Aluminum Foil Facing Specification 

TYPICAL PHYSICAL PROPERTIES:

PROPERTIES

UNIT

VALUE

TEST METHOD

Basic weight

gsm

80

ASTM D646

Tensile strength: M. D.

               X. D.

N/25mm

95

50

ASTM C1136

Burst strength

N

25

ASTM D774

Reflectivity of foil surface

%

95

----------

Temp. Resistance

-29°C

+66°C

No change

 keep soft

ASTM C1263

Water vapor permeance

ng/N.s

1.15

ASTM E-96

Water Soak Test

24hrs

No delamination

----------

Width: 1.0m, 1.2m, 1.25 m, 1.30, 1.37m

Length: 200m, 500m, 1000m, 2500m, 2750m, 3300m

Core I.D.: 3"(76mm ±1), 72mm ±1

Based on order, special sizes are also available.

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

(1) How about your company?

 A world class manufacturer & supplier of aluminum foil facing and is one of the large-scale professional investment aluminum foil facing bases in China. Annually more than 1000 containers of aluminum foil facing are exported to markets in Europe, America and Japan.

(2)What is the storage condition?

The products should be stored at room temperature and kept from wet and heat source.

It is essential, as with all pressure-sensitive tapes, that the surface to which the tape is applied must be clean, dry, and free of grease and oil.

The user should take test and do trial-application on the above products before coming into application so as to witness and ensure suitability for user’s special purpose and technique. 

(3) How to guarantee the quality of the products?

 We have established the international advanced quality management system,every link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

(4) How long can we receive the product after purchase?

 In the purchase of product within four working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served 

 

 

 

Q:Will the embedded stove why use stainless steel corrugated hose connection?
62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
Q:How to strengthen the construction management and construction quality control
Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
Q:Does the desulfurization and denitrification equipment use metal hoses?
Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
Q:What is the effect of concrete pouring on the construction quality?
Our usual way is to fight the fuse.
Q:What are the scope of construction work special operators?
Cost plus cost plus artificial plus profit on the line! Regional differences are great!
Q:Two hundred galvanized pipe should be under the large flexible tube
We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Q:What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
national, provincial and municipal projects related to the construction of policies, laws, regulations and the relevant industry regulations
Q:Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
1.5M is the thickness of the board? If it is, in view of the large amount of concrete from the major, then the long spot of the short spot of the prisoners need to pay special training program reported to the chief engineer or expert approval, which is also the most important [template bearing capacity design calculation], proof of design Of the construction program to meet the bearing capacity of concrete to ensure that the template and its bracket should have sufficient carrying capacity, stiffness and stability, can reliably withstand the weight of pouring concrete, side pressure construction load. In recent years, because the construction of non-standard template led to the collapse of a lot of scaffolding, hope to be cited
Q:Is the flexible sleeve of the broken wall used as a second retest?
The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
Q:Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords