• CMAX Construction Hoist SC200/200 System 1
  • CMAX Construction Hoist SC200/200 System 2
  • CMAX Construction Hoist SC200/200 System 3
CMAX Construction Hoist SC200/200

CMAX Construction Hoist SC200/200

Ref Price:
$10,000.00 - 60,000.00 / unit get latest price
Loading Port:
Dalian
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 

Building Hoist SC200/200 with Good Quality

 

The construction hoist product  achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And  is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

 

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system. 

 

 

Main Parts of Building Hoist 

 

1. Adopts the most advanced VF speed control device and microcomputer programmable logic controller.

 

2. Stepless speed control helps eliminate the concussion during start up and braking, steady the operation process, and ensures automated leveling.

 

3. Adopts open loop V/Fcontrol; the speed control precision can reach ±2~3%. Realizes accurate low speed positioning of the hoist and avoid slipping during downward stopping of hoist.

 

4. The VF system has current-restriction function, ensuring a small current when motor start up and reducing the concussion to power supply. It reduces the engery consumption and mitigates effects to on site electric equipments.

 

5. The steadiness during running mitigates concussion to mechanical parts, reduces wears of rack, pinion and the brake and prolongs the spare parts'life.   

 

6. The VF system also has the over voltage protection,low voltage protection, overcurrent, overload and anti-stalling protection functions,

 

7. The system applies the special software for hoists developed by our company, making the operation more safe and reliable.

 

 

Technical data of Construction Hoists    

SC series product also has special design, such as reinforced guide rail with cross-section of 800mm, inclined type, special for cooling tower, etc. All the double cage construction elevator can be changed into single cage type, such as SCD200.

Model

SC200/200

SC200/200BP

SCD200/200

SC200/200B

Configuration

Standard type

Frequency conversion

Counterweight type

Export type

Rated load

kg

2000/2000

2000/2000

2000/2000

2000/2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

16/16

16/16

16/16

Max.lifting height

m

150

300

150

150

Max.height of free end

m

9

9

9

9

Lifting speed

m/min

33

0~60

33

33

Capacity of small hoist

kg

200

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×3/11×3

11×3/11×3

11×2/11×2

11×3/11×3

Speed limiter

Action speed

m/s

1.2

1.45

1.2

1.2

Rated brake load

kN

40

40

30

40

 

Model

SCD200/200B

SC100/100

SCD200

Configuration

Counterweight type

No counterweight

Counterweight type

Rated load

kg

2000/2000

1000/1000

2000

Cage size L×W×H

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Passengers

16/16

12/12

16

Max.lifting height

m

150

150

150

Max.height of free end

m

9

9

9

Lifting speed

m/min

33

33

33

Capacity of small hoist

kg

200

200

200

Std.section L×W×H

mm

650×650×1508

Electric motor

Type

Disc brake electic motor

Power

kW

11×2/11×2

11×2/11×2

11×2

Speed limiter

Action speed

m/s

1.2

1.2

1.2

Rated brake load

kN

30

30

30


 

 

FAQ 

Note: Both cage size of 3×1.3×2.2 and 3.2×1.5×2.4 are available for of each model (Excl. export type).

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.

 

Q:What is the main function of elevator motherboard?
The elevator motherboard is different from each brand, and it functions like a computer motherboard
Q:Safety device for construction elevator
1. The governor To prevent the hanging basket construction elevator overspeed or fall and set up a safety device, is divided into a unidirectional and bidirectional type two kinds, the one-way speed limiter can only along the direction hoisting cage falling within the speed limit, two-way speed limiter can up and down along the hoisting cage speed effect on two directions. The speed limit shall be tested for performance in accordance with the prescribed time limit. 2. The buffer spring Buffer spring in spring seat connected to the base frame, so that when hanging cage fall accidents, reduce the impact of the hanging basket, at the same time ensure crane cage and weight drops landed into flexible contact, slow down the hoisting cage and the impact of weight landing. The buffer spring has a cone winding spring and a cylindrical spiral spring. Usually, there are two or three cone coiled springs or four cylindrical coils on the base of each cage.
Q:How many meters is the wall of the construction elevator?
The height is greater than 60 meters every six meters.
Q:For example, what records do you want to have a third party monitoring?
Important parts replacement needs to be changed to the qualification, the procedure is like the new ladder, according to the new ladder standard test.
Q:How many guides are in the construction elevator
1 guide frame is 1508cm, the highest can be 400 meters
Q:Is the construction elevator the same as the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer. The structure principle and characteristics of construction lifter: construction lifter for meet the needs of the lean construction bridge, chimney, etc, it according to the building shape, install the guide frame tilt, and hanging basket level, along the inclined guide plane running up and down.
Q:What is the main function of the construction elevator safety guard
For safety device of construction hoist main effect is in the process of elevator used in times of emergency power, hit the brakes, let hoisting cage security attached on the guide rail frame, prevent the hoisting cage falling!
Q:What's going on with the decline in construction lift
Check to see if there is any problem with holding the brake. There is no problem with the contactless contactor, which is the most common cause of the vehicle. Normal contactor will rebound at the moment of you to stop operation, adhesion would be stuck there for a few seconds and then bounce back, in a few seconds the brake coil is charged, the brake is still in open state, but the motor has stopped working, so will decline, it's adhesion change the same contactor change.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:What about the energy efficiency of the escalator
Variable frequency construction elevator energy saving effect general. Frequency conversion is not energy efficient. The difference between the frequency and the common machine is the smoothness and speed of the operation. Frequency conversion speeds up to 90m / 1 minutes and the average is only 35m / 1 min Frequency conversion when parking is slow down and stop Ordinary is directly stop delay parking and adjustment made door light who bow Angle decyl with brush spring connection will be better. The frequency conversion requires the site voltage to be strictly a little bit looser than the voltage requirement Energy consumption is: according to the elevator drive mechanism for general three transmission two kinds of the elevator are three 11 kw motor, that their energy consumption are 3 x 11 = 33 kw is hours each hanging basket consumes electricity 33 degrees, the actual power consumption will be bigger.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords