• Building Hoist Single Cage 3000kg for Sale System 1
  • Building Hoist Single Cage 3000kg for Sale System 2
  • Building Hoist Single Cage 3000kg for Sale System 3
  • Building Hoist Single Cage 3000kg for Sale System 4
  • Building Hoist Single Cage 3000kg for Sale System 5
  • Building Hoist Single Cage 3000kg for Sale System 6
Building Hoist Single Cage 3000kg for Sale

Building Hoist Single Cage 3000kg for Sale

Ref Price:
$10,000.00 - 50,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Description

The electrical crane is installed on the top of the cage, and it is a necessary tool for increasing and decreasing the mast sections. After the base frame’s installation, the electrical crane can be used to lift the mast sections inside or on the top of the cage for adding them onto the top of the mast. Conversely, during the disassembling work, the crane also can be used to disassemble the mast sections. In addition, we also can equip the electrical crane specially used for lifting the rebar according to the customers’ requirements.

 

6. Safety device

This system aims to ensure the hoist runs safely, which is mainly composed of electrical motor braking, anti-drop safety device, top & bottom limit switches, top & bottom 3-phase switches, door limit switches and buffer device mounted in the base frame, overload protection system is available for option with extra cost.

 

The electrical motor brake is used for hoist’s normal stop, with electrical & magnetic braking theory. When the hoist runs, the brake is off; when the hoist stops, the brake is activated. This device can adjust the weariness clearance of the braking disk and ensure the braking to be safe and reliable.

 

Anti-drop safety device will be activated on the occasion of the cage’s accidentally dropping. It is the patent technology of us, makes braking properly and actively and also reduces the impact on all the structure. And this mechanism can also detect the brake disc’s wearing without opening the safety device, which is of high reliability, maneuverability and safety. The device’s features’ of less impact, no damage to the whole structure, zero error, are advanced technology both domestically and abroad.

 

Main Parts of Building Hoist 

 

1. Adopts the most advanced VF speed control device and microcomputer programmable logic controller.

 

2. Stepless speed control helps eliminate the concussion during start up and braking, steady the operation process, and ensures automated leveling.


3. Adopts open loop V/Fcontrol; the speed control precision can reach ±2~3%. Realizes accurate low speed positioning of the hoist and avoid slipping during downward stopping of hoist.

 

4. The VF system has current-restriction function, ensuring a small current when motor start up and reducing the concussion to power supply. It reduces the engery consumption and mitigates effects to on site electric equipments.

 

5. The steadiness during running mitigates concussion to mechanical parts, reduces wears of rack, pinion and the brake and prolongs the spare parts'life.   

 

6. The VF system also has the over voltage protection,low voltage protection, overcurrent, overload and anti-stalling protection functions,


7. The system applies the special software for hoists developed by our company, making the operation more safe and reliable.


Building Hoist images

 

CMAX Building Hoist

 

Building Hoist Single Cage 3000kg for Sale

 

Anchorage System

 

Building Hoist Single Cage 3000kg for Sale

  

Driving Unit

 

 Building Hoist Single Cage 3000kg for Sale


Warehouse

Building Hoist Single Cage 3000kg for Sale


Building Hoist Specifiction

 

 Building Hoist Single Cage 3000kg for Sale

FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.


Q:Is the construction elevator a special equipment
The construction elevator is special equipment, the installation and demolition of the special construction plan, after the installation, the special equipment can be tested and qualified for use
Q:The construction elevator can only go up can't come down what happened
Does the motor have electricity when it falls? Look at the switch and the line first, then check the controller.
Q:Why do you ask the construction elevator to be a certain distance from the structure? Is very close to if not you can not bother to do delivery channel security protection or something, out of the elevator out directly, and attachment should be able to get more easily, to solve. Thank you very much!!
The distance between the moving parts and the building and the fixed construction equipment shall not be less than 0.25 m. The main thing is to prevent the person from the point of view. For example, workers are on the third floor to look down, hanging cage, where is the result now hanging basket is go down from the fourth floor, if not the 25 cm, likely to brush "cut".
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator is running in an abnormal condition, it should stop immediately and take effective measures to bring the ladders down to the ground floor. When the electric is out of control in operation, the stop button should be pressed immediately. The stop button is not allowed until the failure is ruled out.
Q:How many floors are built to use the construction elevator? With six floors?
No use on the 6th floor, use longmen well frame transportation material
Q:Gear rack driven
The driver of the elevator ladder cage is driven by two or three worm gear reducers, which carry heavy lifting parts, and gravity is carried by the rack. At rest, the force point is in the meshing of the gear and rack. It is the main balance between the rewire rope and the ladder cage and the relative motion. For heavy can improve dynamic performance, a heavy on the ladder cage running more smoothly, when a fall, fall of heavy can slow down the ladder cage speed, it should be said that safety performance is better.
Q:Construction elevator positioning should consider which problems
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content. Based on past accidents and on-site inspections, we often find topics that we think should be examined in a critical area
Q:How does the elevator operate
Responsible for operating elevator, maintenance, maintenance and safety. See what kind of elevator and workplace you are working on.
Q:The construction of more than many floors must be used for construction elevators
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs. Pre-installation preparation: After construction, the manufacturer will show the product certificate and provide the instruction manual. According to the technical requirement of installation safety technology checking list according to the construction elevator, the preparation should be inspected. The installation operator should hold the certificate, accept the technical, safety, etc., and make the safety operation rules for the construction lifter. 3, work environment: 1) the power supply must meet the requirement of power supply. 2) no electricity, gas welding or other obstacles to the operation of the crane are prohibited within the part of the elevator installations. 3) the platforms and channels that enter the building from the suspended cage shall reach the bearing capacity of more than two tons, and have strong protective barriers and protective doors. 4) it is forbidden to use guide rack, attached part scaffold, construction platform and the floor channel stretch, pipeline, rope, rope, banners, flags and other things has nothing to do with the elevator; In the evening homework, there should be sufficient illumination. 6) the doors to the floor will be kept in the door, each with a clear sign of the floor number.
Q:The difference between the derrick and the construction elevator?
You want the picture to still want to explain, the words to go to baidu search all can. The derrick is not to be multiplied by the person, the setting height is not more than 30 meters, now most of the place begin to phase out the use of the derrick, because the safety coefficient is low. The construction elevator can carry cargo, set up a height of 150 meters, and can carry a weight of 1-3 tons

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords