1.Overall haulage with only a 5t vehicle for whole machine transportation. Haulage size can smoothly pass all standard bridge and culvert.
2.After quick erection, it can start working normally within one hour.
3.Correctly-positioned mechanism kinematics spacing.
4.High precision and reliable load moment limiter and load lifting limiter.
5.Special system: wheelbarrow persist axis break
6.Two purpose: arm-brace fixing and orbit walking
7.Overall haulage bridge can be easily altered into a transport tow (10t)
8.35m height and could be used 30 degree higher up
9.Crane body locked automatically, crane jib docked automatically, pulley at jib point positioned automatically. There is no artificial high-altitude operation through the whole erection and dismantling process.
Max.Lifting moment | 40 tm | |||||||
Lifting capacity | 4 Ratio | 4~11m | 11~36m | |||||
4.0t | 4.0~1.1t | |||||||
2 Ratio | 4~21m | 21~36m | ||||||
2.0t | 2.0~1.1t | |||||||
Lifting speed | Ratio | α=2 | α=4 | |||||
ton | 2 | 1 | 4 | 2 | ||||
m/min | 0~24 | 0~29 | 0~12 | 0~14.5 | ||||
Slewing speed | 0~0.65r/min | |||||||
Trolleying speed | 20/30m/min | |||||||
Erect Height | 30.9m | |||||||
Working temperature | -20℃~+40℃ | |||||||
Total power | 24.9KW | |||||||
Lifting mechanism | Motor | Model | YEJ160M-4 | |||||
Power(kW) | 11 | |||||||
Speed(r/min) | 1460 | |||||||
Uplifting mechanism | Motor | Model | YEJ100L2-4 | |||||
Power(kW) | 11 | |||||||
Speed(r/min) | 1430 | |||||||
Slewing mechanism | Motor | Model | YLEW112L-55-6B1 | |||||
Moment(N.m) | 55 | |||||||
Trolleying mechanism | Motor | Model | YDEJ100L-4/6 | |||||
Power(kW) | 2.2/1.5 |
- Q:Please, if their is a site that shows how to build a crane, provide a link. btw: i do not want to buy some sort of crane building kit.Thanks
- Do you need to build it so it can pick stuff up, cause thats gonna require, magnets and alot of other stuff, that I don't feel like talking about, bye:(
- Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
- Q:Does anyone know where I can locate a print or lithograph of the chromolithograph done in the 1850's of William John WIlgus' Ichabod Crane and the Headless Horseman?
- Preach is son! I know in my case I ask if something looks good on me or if I look good because half the time I can't tell if something looks hideous on me or not. I always used to get picked on when I was younger as well because i grew up in an area where everybody was blonde haired and blue eyed, and I'm italian with extremely dark features so I stuck out! The popular girls tore me apart and I coudln't STAND to look at myself in the mirror. Yuck, dark, dark times. But then again, those girls were just trying to make themselves more secure, and they're the kinds of people fishing for compliments. heh.
- Q:I know this is a longshot someone will know what I'm talking about... but I just got a flash memory of a poem where a bird with long legs (I believe cranes, but it could have been flamingos or some other bird) and kids threw stones at them and their legs just snapped.... that's all I can remember, but I remember whatever the line was describing the legs snapping really well because it was in such sharp contrast to the rest of the poem.... anyone have any clue what poem this is?
- The Crane and The Crow'-Aesop's fables The farmer threw the stone at the crane and broke both his legs. The injured crane said to the crow, What has become of your God-given prophecies? Why didn't you warn me that his was going to happen?
- Q:how do they take crane off top of building?
- Giant crane is used helicopter to lift it up and bring it down from very tall building.
- Q:How to choose tower crane in engineering, such as arm length and lifting weight?
- First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
- Q:I have recently mounted a Meiller MK 40 R / 2 crane on my truck and I wonder if my truck's hydraulic pump can support it without problems. I have a Mercedes-Benz 813 truck of 1987 and the crane is more or less the same years by the way. Should I change my truck's pump?
- Click here to find your answer
- Q:I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
- President Snow killed him because he allowed the games to break its rules for the first time ever by having two victors. What Katniss and Peeta did was a sign of rebellion and the Capitol relented by letting both of them live, otherwise that there would be no victor. That was not supposed to happen and President Snow had already warned him to stop any signs of rebellion prior but Crane let it happen. Someone needs to be held responsible and since Crane is the gamemaker, he has to die. This is to show that no one holds greater power than Snow over the districts and Capitol and no one should defy him. Rebellion leads to death, no matter what your role is or how you might have contributed to it.
- Q:Form the movie Dreamer, daughter of Ben Crane
- It was Dakota Fanning that played Cale Crane, daughter of Ben Crane in the film Dreamer: Inspired by a True Story. She's a good little actress. I love to watch her films.
- Q:Is the pink paper crane used to represent Lulu?
- well i have NO IDEA of what ur talking about lol im just stopping by to thank you for making my life EVEN MORE PATHETIC! lol when u mentioned that u joined runescape i did too... and LITERALLY spent my WHOLE Saturday playing! hahaha its addictive as hell!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
QTK20 Fast Erection Tower Cranes Construction Tower Crane High Quality
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords