• Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting System 1
  • Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting System 2
  • Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting System 3
  • Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting System 4
  • Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting System 5
Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting

Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
500000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Features and Characters of aluminium flexible ducts:

1)Non-insulated and insulated Flexible Duct offered  2) Up to 150 and 250 Max. temperature   3) Fire retardant   4) OEM&ODM service offered

Introduction of aluminium flexible ducts:

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.

1)     Non-insulated Flexible Duct Structure: Two-layer aluminum foils +1 layer of PET film.

2)     Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool, Outer jacket: 1 layer of Aluminium foil   Glass Wool Density: 16kg/m3; Thickness: 25mm

3)     Combined flexible Duct

Pictures of alumnium flexible ducts

Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ducting

FAQ of of aluminium flexible ducts:

1.      What temperature maximum? Our products: 150 and 250

2.      What MOQ? Our MOQ: 500 pcs

3.      What payment terms? We accept T/T and L/C

4.      What lead time: 10 days

 

 

 

 

Q:The first generation of the tube is that year out?
In general, there is also a strong ability to resist, it is likely that there may be cracking
Q:How to effectively deepen the construction process management to improve the quality of construction projects
Steel is good, it is best stainless steel, aluminum alloy for a long time easy to deformation, organizational structure is very bad!
Q:How is the flexible casing of the fire pond connected to the tube?
Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
Q:What is the difference between a rigid sleeve and a flexible sleeve?
Apparent density of 23kg / m3 or more, the greater the density the more expensive.
Q:What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
Masonry structure construction, the number of pole set which several
Q:Cast iron flexible tube A type B What is the difference
See JGJ130-2011 "construction of fasteners steel scaffolding safety technical specifications" 'structure of the valve enamel crisp raccoon Yi Yi paralysis nitrogen Kai made requirements'. ... set the steel pipe as a foot, the first step from the first 1.95m, steel pipe spacing of 2m, two steel pipe between the small
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q:Is the flexible sleeve of the broken wall used as a second retest?
Safety nets, helmets, seat belts, insulated gloves and so on
Q:To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
It should be JGJ130-2001 Ministry of Construction 2001-02-9 approved 2001-06-01 implementation
Q:How to optimize the construction management to improve the quality of construction projects
I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords