• Yuchai YC6A 199kw-2300rpm bus engine System 1
Yuchai YC6A 199kw-2300rpm bus engine

Yuchai YC6A 199kw-2300rpm bus engine

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Yuchai YC6A 199kw/2300rpm bus engine

Type

Model

Displacement
(L)

Emission

Rated Power
(kw/rpm)

Maximum Torque
(Nm/r/min)

YC6A
Series

YC6A240-20

7.255

Euro II

177/2300

860/1500

YC6A260-20

191/2300

950/1500

YC6A280-20

206/2200

1100/1500

YC6A240-30

Euro III

177/2300

900/1400-1600

YC6A260-30

191/2300

1000/1400-1600

YC6A240-40

Euro IV

177/2300

900/1400-1600

YC6A260-40

191/2300

1000/1400-1600

YC6A270-40

199/2300

1000/1400-1600

Keywords:bus engine,yuchai bus engine,diesel engine, weichai engine,weichai,chinese engine
Yuchai slogan:Outstanding Quality Global Yuchai
Feature:

Higher efficiency, lower fuel consumption, better for environmental protection

Bosch E-control high pressure Common Rail, Meeting the Euro-II,III,IV and V standard of emission

 Power range covering 66-294 kW


Q:I have to move about 5 inches of dirt with a length of probably 15 feet and a width of 10 feet. Is there any other way that is easier than a shovel and a wheelbarrow?
Yes, a Bob Cat, or excavator. You could use tnt, but will have problems with the local police department.
Q:I have dreams about bridges. Somebody tried to transport a excavator across a stone bridge in my dream and the bridge collapsed. I need to learn to dream walk to put it back together. It is VERY important to the safety of the United States. It has something to do with the plates of Joseph Smith so any shamans who can show me how to dream walk would be appreciated, thank you.
sure! I enjoy that always. And the goals which come actual, are most likely dreamt years in the past, and normally while i used to be wakeful. It would even be recommendation, that did not make experience on the time. Like, as soon as, I used to be sitting in a automobile and it got here to my brain Remember that during Bades?en(a pool neighborhood, do not pass there most likely) if you are sitting at THIS factor, there is 2 approaches to return there. You will pick the incorrect. two years later, I went to the pool, having forgotten approximately the dream. And I needed to uncover my household once more, however I could not. Then I remembered, I'd selected the incorrect approach. Really creepy.
Q:I have a Komatsu PC50 mini-excavator. My worker changed the diesel filter and now it won't start. He says the diesel isn't getting through so perhaps there are air pockets? How would I resolve this issue?
1. Loosen the fittings on the filter to purge air... 2. Lightly ether start engine... 3. Tighten fittings when leaking diesel fuel...
Q:the health risks are from it being there
call your land lord and insist it be cured immediatly if you own, it gets rougher. there is a leak/blockage.or a full tank i would check the tank level, then rent an augur, then dig. get out the canal wrench and dig the area out to see what kind of pipe you're dealing with. abs is easiest, clay can be ugly, and ductile is impossible for most homeowners
Q:My father won an auction on the internet for a really nice excavator that looks too good to be true. The seller wants us to pay him first before he delivers it to us. I was wondering if there was a form of payment similar to escrow, where we transfer the funds, but the seller does not get to access it until the equipment is in our hand and we approve of it.
I am assuming you bought this on Ebay. Paypal is the online OKorder account that acts as an escrow account. You put the money in, which notifies the seller. The seller delivers the product then can collect the money. If you do not receive the item, you can contact paypal and they take that money right back out of the seller's account. A credit card does exactly the same thing. If you don't get the property, you have 30 to 60 days to contest the charge and get the money right back. Hope this helps.
Q:What brand is excavator WORLD?
Heavy industry products, the company is located in Zhenjiang city of Jiangsu province.Small brands are not recommended to buy.
Q:Paul found with Peter's bones:
And your point is...? Peter and Paul both died in Rome. Why shouldn't they be buried together?
Q:Hitachi 120 excavator size?
Basic parameterWhole machine quality (Kg):12200Standard bucket capacity (M3):0.52Rated power (HP/KW):63main performanceWalking speed (Km/h):5.5/3.4Slew rate (RPM):13.7Bucket digging force (Kg):99Standard track width (mm):500Bucket digging force (Kg):65EngineModel: ISUZU CC-4BG1TCRated speed (RPM):1950Working rangeMaximum mining depth (mm):5570Maximum unloading height (mm):6160Maximum radius of excavation (mm):8270Fuel tank volume (L):250Digging machine sizeFull length (mm):7610Full width (mm):2500Full height (mm):2680
Q:I have a bad final drive gear box, and I need to remove the tracks, to remove the gearbox.
Information is below.
Q:Hey everybody... Looking to build an underground house of sorts. Always wanted to tackle a project like this. In Arkansas, what's a ballpark cost of having somebody dig a hole in the ground... 12 foot deep, 40X40 ft across? No transporting soil, just put it all in a pile nearby. Thanks in advance!
You would need to hire two machines to have4 flat verticle sides. A front end loader and a back hoe. I would take only one day and both usually are hired for $125 per hour with an 8 hour minimum. So your looking at $2,000. If you dont mind one side having a ramp to the front end loader can go in and out. Then you'll only need the one machine. $1,000. This time of year, find a pool builder. He's probably and slow, needs the work, and willing to negotiate.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords