• Plastic PVC White Picket Fence for Wholesales System 1
  • Plastic PVC White Picket Fence for Wholesales System 2
Plastic PVC White Picket Fence for Wholesales

Plastic PVC White Picket Fence for Wholesales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Plastic PVC White Picket Fence

1. It can keep good looking for years which are longer than wood fence.

2. You need not to paint or stain. And it can resist being fade.

3. Strong point: aluminium steel inser to reinforce the fence.

4. Our products are environmental friendly and non-toxic.

5. We can offer any length or size according to your needs.

Plastic PVC White Picket Fence show :

Factory Capacity :

Trade Items Of  Field Horse Fencing

Packing:1. Envirnment PE bag export packing
2. Carton as customer's request
Transaction:T/T,L/C,D/A,D/P, Western Union
Payment Term:FOB,CIF,CFR
Port:China main port
Delivery time:supply quick delivery time, normally 15 working days
Sample Cost:Free sample cost
Sample Time:Small piece sample one day, full section sample 2 days

Service:

1.Sample can be offered with free sample charge and courier fee by buyer's side. 

2.We have full stock and can deliver within short time.

3.OEM and ODM order are accepted, Any kind of logo printing or design are available.

4.We offer you the different types of product.

5.Good Quality + Factory Price + Quick Response + Reliable Service, is what we are trying best to offer you.

6.All of our products are produced by our professional workman and we have our high-work-effect foreign trade team, you can totally believe our service. 

7.We are very glad that customer give us some suggestion for price and products.

FAQ:

Why choose us ?

 1.Commpletely production line. From raw material to delivery, all fences have passed strict tests, so the quality can be assured.

2.Delivery time: about 7 days for a 20ft container.

Where is our main market ?

The products are exported to Northern America, Australia, Canada,Europe and so on.

 

 

Q:A few days before the night, my boyfriend drove, because not familiar with the road, accidentally damaged traffic guardrail, fence in front of the right lead to depression, (it was only the right side of the damaged head) then the accident appraisal center, out of the 4.32 meters square line fence (2) the amount of 1300. upright and round end (1) the amount of 500. blocks (4) 240. I do not want to lose, just want to ask such a reasonable compensation.? ask professional personage to give answer, thank you!
The identification center has made an expert conclusion and the law is supportive. Of course, you can also refuse to identify the conclusions, apply for re identification.
Q:Skid severing fence to the opposite lane after the rear end, how to divide the responsibility
5, the former car is too long, and did not set the obvious warning signs according to regulations, the formation of rear end traffic accidents, the former car to bear secondary responsibility for the accident, the latter car to bear the main responsibility for the accident;6, the former car reversing or slide after the collision of vehicles formed rear end traffic accidents, the former car to bear all the responsibility for the accident.
Q:How to punish guardrail hit escape?
The circumstances are serious and constitute a crime:If a major road accident is committed in violation of the laws and regulations of road traffic safety, if the case constitutes a crime, criminal responsibility shall be investigated according to law, and a motor vehicle driving license shall be revoked by the traffic administrative department of the public security organ.
Q:Is the grade B wave beam guardrail only installed at the corner?
Installation of round column. According to the "rules" of traffic safety facilities of highway JTG/T specified in the D81-2006 set in the soil B in grade two wave beam guardrail post embedded depth should be less than 125cm; set in the soil base class A, Am grade two wave beam guardrail post embedded depth should be less than 140cm; set in stonework, underground a pipeline section concrete foundation in the guardrail, post embedded depth shall not be less than 40cm. But in the actual construction, the shoulder and the central zone of the lower the complexity of the situation, such as gravel (such as large area construction, etc.) often appear in the soil column hit deep enough, in some places the 1/3 sections of the column do not go to fight for as cast high cost construction method, construction teams often use night cutting method reduce the column depth for illegal operation,. After cutting the column installed guardrail, it can not reach the collision requirements, and can not guarantee the driving safety of the highway. Owners, supervisors and contractors should resolutely put an end to this phenomenon. Found a strict together, without leaving future trouble. As long as the owner, the supervisor and the contractor pay more attention to the construction site, the problem is easy to solve.
Q:I hit the guardrail by car and didn't report insurance, did I?
Why do you buy insurance?. 1, specifically to see what you buy insurance, there is no driving liability, if it is not deductible, the general insurance is to pay in full; 2, traffic accidents are generally not penalized; 3, the facts are clear, now the insurance company claims procedures is very convenient, the amount is not large and complete formalities generally you can get the money directly.
Q:I crashed into the guardrail on Saturday, and I drove off. After second days I went to the accident spot and found no escape
The traffic accident qualitative standard escape case, the accident party said they were not responsible to navigate away from the scene, after the report does not fulfill the obligations at the disposal site, abandoned the vehicle from the scene of the accident and then returned to the other 8 kinds of situations will be identified as a traffic accident
Q:Sidewalks, overpasses, tunnels, fences, these are traffic facilities or road facilities?
If there are some signs on the sidewalk, such as signs and signs, they belong to traffic. The fence is part of a separate roadway belt or bridge structure.
Q:Traffic accidents, after escaping, surrendered, crashed guardrail, no casualties, how will the sentence? 1 will they be in custody? 2 what will be done if the penalty is deducted?
2. if a major traffic accident constitutes a crime and does not escape, the motor vehicle license shall be revoked by the public security organ except for criminal responsibility according to law
Q:Should a guardrail be installed on a high embankment with a radius less than the radius?
Standard for setting guardrails on grade a highways:Set up traffic guardrail as follows: in a pedestrian, bicycle or other vehicle across the highway and a highway segment, especially the station or at the intersection overpass or underpass, should be set up. A road without setting and overpass or underpass bike location, pedestrian safety management should be set up in other label records, highway, according to the actual situation, set the necessary overpass or underpass.
Q:What is the height dimension of highway guardrail?
The effective height specified in the national JTJ074-94 fence standard ranges from 1.6~1.8m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords