Air Condition Vent Mold Exhaust Air Valve for Construction or building
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description Air Condition Vent Mold Exhaust Air Valve for Construction or building
Air condition vent mold Exhaust Air Valve Is Engineered polymer construction, Three-way deflection,Traditional styling,Integral multi-shutter damper with easy to use damper handle For heating or cooling applications
Specifications of Air Condition Vent Mold Exhaust Air Valve for Construction or building
Exhaust Air Valve
Made of Galvanized Steel
exhaust air valve
Size 80, 100, 125, 160, 200mm
Removable core, with collar
Exhaust Air Valve
Material: Galvanized Steel
Finish: White powder coated
Size: 80mm, 100mm, 125mm, 160mm, 200mm
Removable core, with collar
For ceiling air supplying
Easy installation, and good performance
Packaging Detail: Standard export packing ,Your requirment accept.
Delivery Detail: 3-5 weeks
Advantage of Air Condition Vent Mold Exhaust Air Valve for Construction or building:
1.Competitive price.
2.Continuance service and support.
3.Diversified rich experienced skilled workers.
4.Custom R&D program coordination.
5.Application expertise.
6.Quality,reliability and long product life.
7.Mature,perfect and excellence,but simple design.
Feature of Air Condition Vent Mold Exhaust Air Valve for Construction or building
Engineering capabilities include:
1.Parts design.
2.R&D products.
3.Prototype design and production assembly.
4.Reputable design software used for all design work.
5.Hot runner design.
6.Cold runner design.
7.Fast automatice remould design.
8.Mold design with a team of experienced specialists.
Process of our company :
1.Quote competitive price according customer detail requirement.
2.Sign agreement.
3.Customer T/T deposit to us to start to design mould.
4.Send mould drawing to customer for confirmation.
5.Mould design confirmed and start to make mould.
6.Make mould trial during tooling time (which we get agreement with customer)
7.Send mould trial sample to customer for inspection.or customer come to our factory to inspect mould personally.
8.Customer T/T balance to us after mould confirmed.
9.Deliver mould after get balance.
Application of Air Diffusing Grille for Construction or building :
It is mostly used on the sidewall outlet type air distribution. We always export to supermarket to USA ,CHILE ETC. For heating or cooling applications.
Double grille for spiral duct
1.Installed on a circular duct without frame or other fastening device.
2. For large location
Double grille for spiral duct
Material :Galvanized steel sheet
1.Frame thick:0.8mm. |
2.Installed directly on a circular duct without frames or other fastening devices. |
3.Used for large locations,e.g.in warehouse,factories,workshops,gymnasiums etc. |
4.The blades can be adjusted manually and individually to obtain an optimal air distribution. |
- Q:What are the types of condensers?
- The condenser is often used for the condensation of the two steam at the end of the multi effect evaporator to ensure the vacuum of the final effect evaporator
- Q:What are the system components of condensers?
- The main components of a motor (compressor, fan etc.), operation switch, electromagnetic contactor, relay, chain, thermal overcurrent relay overcurrent relay, temperature regulator, humidity regulator, temperature switch (defrost, prevent freezing etc.). Compressor crankcase heater, water break relay, computer board and other components.
- Q:What are the air compressors for?
- The air force: the traditional pneumatic tools, drilling machine, pneumatic, pneumatic wrench, pneumatic sandblasting
- Q:What is the Basic accessories for air conditioners?
- Sight glass,throttle valve,Compressor, evaporator, condenser and expansion valve
- Q:What about compressor overload protection?
- In the refrigeration system, a protective relay is provided to prevent excessive current and excessive temperature rise of the compressor
- Q:The air-conditioning compressor is stuck. Is there any way to repair it?
- When necessary the appropriate starting capacitor capacity compressor for the specifications of a compressor can be normal to try to start up, and can be used with a screwdriver on the reverse way of trying to solve the compressor body.
- Q:What is the function of the refrigerator compressor?
- The Freon is pressurized by the compressor in the gas state. After pressurization, the condenser flows through the throat to the back of the refrigerator, and then condenses into liquid by the heat dissipation of the radiator (after the material is compressed and the temperature is raised)
- Q:What is the working principle of a two stage compressor?
- The low-pressure refrigerant vapor from the evaporator (pressure P0) is advanced into the low-pressure compressor, which is compressed to the intermediate pressure PM, and then cooled into the high pressure compressor,
- Q:What are the parts of an automobile air conditioner?
- The air conditioning refrigeration system usually adopts the Rl34a compression type closed cycle system. The utility model is mainly composed of a compressor, a condenser, a liquid storage drying tank, an expansion reading (or throttling Kong Guan), an evaporator, etc., a loop part, a hand u, an electric control part, etc.. Each part of the circulating part is connected by turns from a pressure resistant metal pipeline or a fluorine resistant rubber hose in turn
- Q:What is the cause of the overload of the air conditioning compressor?
- The outdoor condenser is out of air and has obstructions
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Air Condition Vent Mold Exhaust Air Valve for Construction or building
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords